| In the majority of cases, commercial ERW Clearance
Contractor operations are carried out according to military principles
by using Standard Operating Procedures (SOP's). In many ERW Clearance
SOP's, Quality Assurance (QA) is a short section which states that
Quality Control (QC) will be conducted by re-clearing a certain area.
This however in no way assures that the entire ERW Clearance process has
been conducted satisfactorily, and therefore the act of merely
re-clearing a "certain area" using the same method will not prove that
the work meets or exceeds the Quality criteria required. The only
proven way that a Client can effectively control and measure that the
level of Quality achieved by an ERW Clearance Contractor is in
accordance with their requirements, and those of the internationally
recognised International Mine Action Standards (IMAS) is to
ensure that the Contractor has an approved Quality Management System in
place and that the implementation thereof is monitored by an
independent and impartial body, both in the field, and at operational
support facility level.
Qualissol can provide their Clients with an independent ERW
Clearance Quality Assurance and Quality Control service, which monitors
on a day to day basis all of the Clearance and Clearance Support
Facility activities carried out by ERW Clearance Contractors. This
service includes, but is not limited to the following activities:
- Conduct pre-mobilisation audits on ERW Clearance Contractors.
- Conduct QA Monitoring on ERW
Clearance Contractors.
- Conduct Post Clearance
Sampling QC Inspections of specified areas.
- Conduct QA of ERW Clearance
Contractor training activities.
- Conduct clearance site
hand-over briefings for follow-on Construction Contractors.
- Provide assistance with
incident investigations where required.
- Provide ad-hoc QA/QC services
and technical assistance.
Key
Client Benefits
- All activities are planned
and performed in a manner that ensures all tasks carried out under
ERW Clearance Contracts are safe, reliable, and free of errors,
defects, and deficiencies.
- Clearance related activities are planned and performed to
achieve required Quality levels within the agreed budget and
schedule requirements.
- All activities are carried out in accordance with contractual
and regulatory requirements.
- ERW Clearance related activities are performed correctly the
first time to ensure cost effectiveness and efficiency.
- All ERW Clearance related activities are carried out within an
environment of Continual Improvement.